Structural Steel Contractor
Lifting and moving solutions for a structural steelwork contractor.
Project Description
A structural steelwork contactor who design, fabricate, paint and erect structural steelwork for the construction industry approached Metreel with a problem of lifting and moving off-cuts of steel.
Industry
Structural Steelwork Contractor
Location
United Kingdom
Products Supplied
Met-Track® Workstation Jib Cranes
Solution
The steel off-cuts could weigh up to 1Ton and be of various shapes and sizes. For each of the 4 saw/cutting machines, Metreel supplied and installed a floor-mounted Met-Track® Workstation Jib Crane with a 1000Kg SWL to their busy steelwork factory.
Each floor-mounted Met-Track® Workstation Jib Crane was supplied with a 5m Span, 3m height of lift, fully powered hoist and slew operation at 2 speeds for greater accuracy and safety.
Want some free advice on a project of your own?